minato-img
Minato Icon

240 Apartments:

  • 75 Attainable Homeownership

  • 32 Affordable Rentals (CMHC) & 75 Attainable Rentals

  • 29 Market & 29 Vacation Rentals

11 Waterfront Homes

bringing-img
bringing-img
property-img
logo

Our Mission - Our Passion

Building Affordable, Sustainable Homes for Ucluelet’s Future.

At ERIF, we are a dedicated housing provider, not just another developer.

Our mission is to deliver high-quality, affordable housing solutions using our patented construction technology, which enables us to significantly reduce costs and make homeownership more attainable for communities.

Ucluelet holds a special place in our hearts, and we’re dedicated to its long-term growth and sustainability. We have chosen Ukee as our home and the base for our innovative building technology—one that we believe will transform the way housing is constructed across Canada.

By working in partnership with the local community, we aim to create sustainable, affordable, and lasting housing that meets the needs of residents today and in the future.

Masterplan Stages

Lot 1: Stages 1 & 2: Attainable Homeownership

  • 18 multiplex buildings

  • 75 quality spacious 1, 2 & 3-bedroom apartments

  • Thirty-six 3-bed offer self-contained ‘Mortgage Helper’ Studio

Lot 2: Stages 1 & 2: Affordable & Market Rentals

  • 16 multiplex buildings

  • 107 quality, spacious 1 & 2-bedroom apartments

    • 32 Affordable Rentals (CMHC) & 75 Attainable Rentals

Lot 3: Minato Bay Residences

  • 11 Waterfront Residential Homes

Lot 4: Commercial & Retail Precinct

  • Proposed: Cafe, Store, Offices

Lot 5: Market & Vacation Rentals

  • 10 multiplexes buildings

  • 58 quality spacious 1, 2 & 3-bedroom apartments

logo-map

Masterplan

masterplan-img

ERIF's Commitment to Community: A Heartfelt Mission

logo
logo

At ERIF Housing Association, our mission is rooted in the belief that true social impact comes from empowering communities through accessible and sustainable housing solutions.

Our focus is on building vibrant, inclusive neighbourhoods that reflect the values of equality and accessibility. By offering price-regulated and locally prioritized apartments, we are not just addressing a housing shortage; we are investing in the long-term prosperity of Ucluelet.

We have designed a beautifully integrated community, offering attainable housing with a mix of affordable and market rentals, attainable homeownership, and market sales.

The Serenity Landing Attainable Homeownership Initiative is a testament to our dedication to fostering community growth, stability, and resilience in Ucluelet. In response to the cancellation of BC Housing's affordable homeownership program, and in collaboration with the municipality staff, the Mayor, and Councillors, we have worked to create a pathway for local families, residents, and businesses to secure high-quality homes at attainable, below comparable market prices.

Economic Growth: We believe that a community's economic prosperity is intrinsically tied to its people and the local businesses they support. High-quality housing and a desirable lifestyle are crucial in attracting and retaining a skilled workforce.

At the heart of ERIF is a commitment to create positive, lasting change. Together, we are making Ucluelet a place where people can build their futures and where community spirit and social good are at the forefront of all we do.

LOT 1: Attainable Homeownership Initiative

ERIF Not-For-Profit Housing Association: Our commitment is to provide attainable homes, priced at below comparable market rates, offering exceptional value without compromising on quality. Our pricing is designed to make living in Ucluelet more accessible.

logo

Lot 1 -Stage 1: 29 Quality Spacious Apartments

  • 2 x 1-bedroom | 13 x 2-bedrooms | 14 x 3-Bedrooms*

Lot 1 - Stage 2: 46 Apartments

  • 4 x 1-bedroom | 20 x 2-bedrooms | 22 x 3-Bedrooms*

*3-Bedroom: Self-contained studio (Mortgage Helper)

Button

Attainable housing, as defined in the Official Community Plan and Housing Agreement, uses census income data to ensure rent or mortgage payments do not exceed 30% of Ucluelet's household income.

3-bedroom apartments offer a mortgage-helper suite that can help offset housing costs and maintain affordability.

Eligibility will be guided by ERIF Housing Association (NFP) and the Serenity Landing Local Community Housing Committee, to ensure the program meets the needs of the community.

minato-img
minato-img

LOT 2: Affordable & Attainable Rentals

Through this project, ERIF Not-for- Profit Housing Association is committed to making home rentals more accessible in Ucluelet, providing stability, and fostering community growth.

logo

Lot 2 -Stage 1: 39 Quality Spacious Apartments

  • 12 x Suites | 6 x 1-bedrooms | 21 x 2-Bedrooms

Lot 2 - Stage 2: 68 Apartments

  • 20 x Suites | 16 x 1-bedrooms | 32 x 2-Bedrooms

  • 107 beautiful spacious, quality apartments.

    • 32 affordable rentals (CMHC) & 75 attainable rentals.

    • 1 & 2-bedroom apartments.

  • 15-minute walk into town.

  • Surrounded by protected salt marsh and mature growth setback

Focusing on a balanced mix of affordable and attainable rental apartments will alleviate Ucluelet's housing challenges, creating opportunities for business expansion and fostering community growth.

Apartments in Lot 2 will provide 30% affordable rentals through CMHC and BC Housings affordable rental program and the remaining apartments will be at attainable rentals.

Attainable housing, as defined in the Official Community Plan and Housing Agreement, uses census income data to ensure rent or mortgage payments do not exceed 30% of Ucluelet's household income.

Button
afford-untitled-design

Thoughtfully Designed Floor Plans

logo

Serenity Landing offers a variety of floor plans to suit your lifestyle needs, featuring 1, 2, & 3-bedroom apartments.

Our 3-Bedroom offers a self-contained studio perfect as a ‘Mortgage Helper’ (long-term rental) or multi-generational living.

logo

3-Bedroom Floor Plan: Approx. Size: 1,198 sq. ft

  • 3-Bathrooms

  • Self-contained Studio (Mortgage Helper)

logo

2-Bedroom Floor Plan: Approx. Size: 813 sq. ft

  • Ensuite & Bathroom

  • Accessibility Compliant (Ground Floor)

logo

1-Bedroom Floor Plan: Approx. Size: 481 sq. ft

logo
Timeless Interior Design

The interior design of Serenity Landing reflects a harmonious blend of beauty, functionality, and timeless elegance.

Each space is thoughtfully appointed with high-quality materials and finishes, creating an environment that is both inviting and enduring.

Neutral tones are carefully selected to complement the natural surroundings, providing a serene backdrop that enhances the overall aesthetic of the homes.

Every detail, from the premium flooring to the sleek fixtures, is chosen to ensure that the interiors are not only visually stunning but also practical and durable.

With a focus on quality and timeless appeal, the interiors of Serenity Landing are designed to offer a luxurious yet comfortable living experience that will stand the test of time

Timeless-designbg

LOT 3: 11 Waterfront Minato Bay Residences

Minato Bay Residences:
Your Coastal Haven

Located at 221 Minato Road, Minato Bay Residences offers a stunning waterfront location nestled beside the picturesque Olsen Bay and Ucluelet Inlet.

The homes are thoughtfully positioned to maximize privacy and connection with the surrounding environment, with gently sloping terrain leading down to the waterfront.

Just a short walk from the Village of Ucluelet, Minato Bay Residences combines the convenience of nearby amenities with the serenity of a secluded coastal retreat, making it a truly unique place to call home.

coastal-untitled-design
Where Luxury Interiors Meet Expansive Outdoor Beauty

The homes at Minato Bay Residences are a testament to exceptional design, spacious living, and the natural beauty of coastal Ucluelet. Each residence is meticulously crafted with attention to detail, blending modern luxury with timeless elegance.

The expansive interiors offer an open and airy atmosphere, enhanced by large windows that frame breathtaking views of the waterfront. Thoughtful design elements, high-quality materials, and a seamless connection to the surrounding landscape create a living experience that is both refined and harmonious with nature.

Complementing the interior spaces, the homes feature expansive outdoor areas that invite residents to fully embrace the serene coastal environment, providing ample space for relaxation and outdoor living.

Minato Bay Residences exemplify the perfect balance of comfort, style, and natural beauty, both inside and out.

Where-Luxury-design

Sustainable Living: Our Community Masterplan

Masterplan Image

Sustainable Housing

nexuslft-untitled-design
IGV-Nexus: Revolutionizing Sustainable Housing Construction

IGV-Nexus redefines construction with its plug-and-play Smart Zone modules, integrating kitchens, bathrooms, HVAC, plumbing, electrical, and smart tech into one efficient system. This approach speeds up building, cuts costs, and reduces waste and environmental impact.

The sustainable benefits of IGV-Nexus include:

  • Reduced Carbon Footprint: By centralizing key home functions into a single module, we minimize on-site construction time and lower emissions.

  • Waste Reduction: Precision manufacturing cuts material waste.

  • Energy Efficiency: Built with solar panels, advanced insulation, triple glazed doors and windows, and energy-efficient systems, our homes offer reduced energy consumption, promoting long-term sustainability.

  • Local Manufacturing: Proudly Canadian-made, supporting local economies and lowering transport emissions.

IGV-Nexus sets a new standard in sustainable efficient homebuilding.

IGV Smart Homes

Delivering cutting-edge intelligent living spaces that redefine the modern home.

Our solutions empower users to fully embrace technology, making daily routines easier through seamless automation. Designed to be intuitive and user-friendly, our enhancements eliminate the hassle of learning new systems.

We prioritize privacy, ensuring everyone retains full control over their digital footprint.

nexuslft-untitled-design
nexuslft-untitled-design
IGV Smart Homes

Delivering cutting-edge intelligent living spaces that redefine the modern home.

Our solutions empower users to fully embrace technology, making daily routines easier through seamless automation. Designed to be intuitive and user-friendly, our enhancements eliminate the hassle of learning new systems.

We prioritize privacy, ensuring everyone retains full control over their digital footprint.

LOT 4: Commerical: Retail & Business Precinct

Proposed Commercial Precinct
  • Situated on the corner of Peninsula Road & Minato Road

  • Accessed via Minato Road

  • Retail & Cafe (Max. 600m2)

  • Offices on upper floor (Max. 600m2)

  • 28 dedicated parking spaces with EV Charging

nexuslft-untitled-design
nexuslft-untitled-design

221 MINATO ROAD COMMUNITY FEEDBACK FORM

nexuslft-untitled

Your feedback is very important to us, please take a moment to share your thoughts and suggestions.

At the heart of ERIF is a commitment to create positive, lasting change.

Together, we are making Ucluelet a place where people can build their futures and where community spirit and social good are at the forefront of all we do.

nexuslft-untitled

District of Ucluelet Council Meeting 24 September 2024 - Question & Answers

Q1) Do Council members have any initial concerns about a road configuration with limited pedestrian facilities and vehicle parking spaces backing onto the roadway?

A) District Of Ucluelet Mayor and Council

  • IK: “My home backs onto a roadway. I don’t think this is different to what we have in the community at the moment. I personally don’t have a problem with it.”
  • MM: “I concur. There are a lot of constraints to this site that means we are going to have to accept some compromises. I don’t believe this is anything to get overly worried about as part of the preliminary plan.”
  • MMM: “The configuration of this property is to create density, which keeps the affordability aspect in parcel.”
  • SA: “I concur.”
  • JH: “I don’t want a pedestrian pathway to be completely ignored. I agree with you IK that this is happening in other subdivisions.”

A) ERIF

  • ERIF has partnered with traffic consultants Watt Consulting to optimize the road and traffic flows for the site. The design balances resident safety, accessibility, and efficient land use to maximize the number of affordable homes.
  • To ensure highest safety, the road will be a private road with a capped speed limit of 15kph, ensuring a slower and safer environment. To enhance pedestrian use, we have incorporated a 2-meter-wide pedestrian path and additional 1-meter-wide shoulder around all roads (as shown in Appendix A). The loop road structure was recommended by Watt Consulting for best traffic flows.
  • Care has been taken to ensure careful compliance with emergency vehicle access, with turning bays in each stage of the development, and an additional emergency exit point to PeninsulaRoad, which has the supportof BC Ministry of Transport.
logo

Q2) Do Council members have any initial concerns with the concept of no additional park land dedication for this development?

A) District Of Ucluelet Mayor and Council

  • IK: “The parkland dedication has already been made. The District have control of that asset and it’s considerable, I think it’s good enough.”
  • MM: “I don’t see a problem with the trail construction costs being worn by the Municipality. They have been forthright about approaching this by keeping costs down, I’m quite willing to meet them on a pragmatic playing field. I agree with highlighting ecological value of Olsen Bay. We should consider potential impacts now to plan for them. I’d like to see it protected, and we have every chance of doing that with ERIF moving forward.”
  • SA: “I agree with IK that there is a sufficient amount of parkland dedicated at this point. It’s an efficient use of space. We will do what we need to do to get the affordable housing in there.”
  • JH: “A little concerned not having the complete Environmental Assessment and wetland delineation, which might ID more spaces that need to be protected. I understand there has already be a large park dedication here. Cautiously not concerned.”
  • MMM: “I believe they are in the progress of getting this completed.”

A) ERIF

  • The 2022 rezoning committed extensive lands as parkland dedication through the waterfront and middle creek area. Nearly 30% of the site was committed at that time, and this has now been legally confirmed as dedicated by the DOU. The original commitment exceeded the typical 5% parkland dedication and creates a natural reserve protecting this land.
  • With this land now legally dedicated, it creates a strong protection for the water features. This is confirmed in the Environmental Impact Assessment prepared by Aquaparian.
  • A dedicated recreation space is proposed for the affordable rental and attainable homeownership communities of Lot 1 and 2 to enjoy which is shown in the Appendix C.
  • These amenities, combined with the green spaces within the development itself, offer an abundance of green space and recreational opportunities to enjoy.
  • We value the Councilors support to uphold the existing parkland dedication, as further reduction in available land would impact the viability of this project to meet Ucluelet’s housing needs.
logo

Appendix B highlights the Parkland Dedication areas now on title which includes a 30-meter shoreline dedication (coloured in green), protecting the waterfront zone.

The area is blessed with nearby trails, bike paths, and existing parks offering ample opportunities for outdoor recreation.

logo

Q3) Do Council members have any initial concerns with the concept of taking on the cost of constructing the trails, and making this a priority capital project so that trails can be completed prior to occupancy of the site by new residents?

A) District Of Ucluelet Mayor and Council

  • SA: “The way it’s worded is as if the onus is back on us, but at the same time the only way this moves forward is keeping costs low, maintaining its affordability. We are in a housing crisis; I believe the trails are important but I also believe we can bare that cost. RMI funding for the future.I wouldn’t hold their feet to fire on this.”
  • MMM: “Yes RMI money would be available for trails.”
  • MM: “One thing that sets this developer apart is they were quite forthright about their costs. I think it would be a mistake to put them in a position where they are on the hook for a major financial investment, which is separate from what they approached us to do, affordable housing.”
  • IK: “Nothing further to do add. I agree this is an ecologically sensitive area and we potentially need something temporary to protect it. Not saying we need to build the trail before this housing is occupied. There may be a more cost-effective solution to doing that protection. Trail yet to be discussed.”
  • JH: “We want this site protected. We don’t people in housing accessing this with no protection, which is where the idea of the trail originated. We have access to RMI funds, I have no issues with taking over the cost but I do think this needs to be prioritized.”

A) ERIF

  • The waterfront land has been dedicated back to the DOU, giving the Council time to consult with the community, plan trails and seek RMI funding.
  • Part of this process may consider the Environmental Assessment Report recommendation that the Council preserve this area in its natural state as a wildlife corridor.
  • ERIF do not see the construction of potential trails as needing to be a pre-condition of approval of the construction of the proposed homes, or their occupation.
  • There will be natural separation of the waterfront from the homes with retaining walls and fencing, designed to complement the natural form and character of the site, in collaboration with the environmental biologist consultants, geotechnical and structural engineering teams.

Q3) Do Council members have any initial concerns with the concept of taking on the cost of constructing the trails, and making this a priority capital project so that trails can be completed prior to occupancy of the site by new residents?

A) District Of Ucluelet Mayor and Council

  • SA: “The way it’s worded is as if the onus is back on us, but at the same time the only way this moves forward is keeping costs low, maintaining its affordability. We are in a housing crisis; I believe the trails are important but I also believe we can bare that cost. RMI funding for the future.I wouldn’t hold their feet to fire on this.”
  • MMM: “Yes RMI money would be available for trails.”
  • MM: “One thing that sets this developer apart is they were quite forthright about their costs. I think it would be a mistake to put them in a position where they are on the hook for a major financial investment, which is separate from what they approached us to do, affordable housing.”
  • IK: “Nothing further to do add. I agree this is an ecologically sensitive area and we potentially need something temporary to protect it. Not saying we need to build the trail before this housing is occupied. There may be a more cost-effective solution to doing that protection. Trail yet to be discussed.”
  • JH: “We want this site protected. We don’t people in housing accessing this with no protection, which is where the idea of the trail originated. We have access to RMI funds, I have no issues with taking over the cost but I do think this needs to be prioritized.”

A) ERIF

  • The waterfront land has been dedicated back to the DOU, giving the Council time to consult with the community, plan trails and seek RMI funding.
  • Part of this process may consider the Environmental Assessment Report recommendation that the Council preserve this area in its natural state as a wildlife corridor.
  • ERIF do not see the construction of potential trails as needing to be a pre-condition of approval of the construction of the proposed homes, or their occupation.
  • There will be natural separation of the waterfront from the homes with retaining walls and fencing, designed to complement the natural form and character of the site, in collaboration with the environmental biologist consultants, geotechnical and structural engineering teams.

Q4) Do Council have any initial concerns with a proposal to remove a 30-metre treed buffer along Highway 4 and substantial tree clearing throughout the developable landsthat would maximize the area for housing construction on the 221 Minato Road site, and which would diverge from OCP Policies 3.162, 3.163 and 3.171 meant to limit the clearingof trees and changes to the public entrance to town?

A) District Of Ucluelet Mayor and Council

  • MM: “I have some initial concerns. I think we need to have a deeper discussion with ERIF about this plan. It’s the entrance to the community. The bulk of this lot has already been cleared, what is remaining there is of questionable ecological value in terms of terrestrial habitat. I don’t want these trees cut down. I think this is something we need to hear the public’s opinionon.”
  • IK: “Everyone loves trees. Our current entrance into town is a drive through forest that leads to a pile of tires. We have an opportunity to increase it’s visual value and create an entrance into a community. If housing is as critical as we all know it is, there will be tough choices on how we deliver our housing target of 800 homes within the next 20 years. We need housing, people are literally crying out for it.”
  • MMM: “This is another one of those little sacrifices that may need to occur to create that density.”
  • SA: “I agree. With the OCP stipulations on tree coverage it seemed more of a form of character as opposed to an ecological refuge. I would want to showcase this project off.”
  • JH: “It’s hard for me to get rid of a tree buffer. I understand to get density we need to narrow it down, but almost making it non-existent, I have problems with that.”
  • MMM: “Also another issue is if you clear a lot of trees, the remaining can become danger trees because they have been protected by the others for so long. It may be a reason to remove the trees so there aren’t any danger trees.”
  • JH: “Yes, the trees were cleared to close to the upper edge of that property those trees may go over in a storm. I don’t see the point of their tiny strip of green at that point.”

A) ERIF

  • The proposed change is not a complete removal of the 30-meter buffer in the OCP, but a reduction to 10 meters from the boundary line, and approximately 20 meter setback from Peninsula Road.
  • An accurate siting of the development relative to the road has been prepared as referred in Appendix D. Detailed distances have been marked on the supporting documentation to demonstrate the treed setback that will remain.
logo

Appendix D

  • Unfortunately, due to clearing and site use by former owners, there has been substantial damage to some trees impacting their health and safety. The trees have been assessed by a formal Arborist tree survey and qualified Danger Tree Assessor as recommended by the environmental biologist. They have been further reviewed in the Archaeology report which found no protected trees of significant cultural value will be lost.
  • In addition to retaining respected consultants for the assessment and preservation of existing trees, ERIF will also invest in the regeneration and enhancement of the site's ecological richness. We have a comprehensive regeneration plan in place set out in the Environmental report:
  1. Plant a diverse array of native trees and vegetation throughout the development including but not limited to 31 Western Hemlocks, 20 Western Red Cedar and 15 Sitka Spruce within the restoration area. The density of the regenerating tree saplings is approximately 3-5 trees per 100m2 which is approximately 114 naturally regenerated trees within the restoration area.
  2. Use organic soil on site as a growing medium for planting areas and salvage native plants, logs and stumps with soil and live native vegetation. This will assist in incorporating native plant seed banks and add natural local form and character to the development.
  3. Use of naturally stacked rock and include pocket plantings using native coastal vegetation. All seeding will include recognized west coast seed mix (i.e. clover, vetch, wildflower).
  • Aquaparian will also be engaged as part of the retaining wall design to ensure where these walls interact with parklands and they contribute to protection of the trees in those zones and their root structures, and enhance the native habitats. Their expertise will ensure that any tree which is classified as dangerous under WorkSafe BC Regulation Section26.11 is removed in such a way that minimizes disruption to the surrounding ecosystem.
  • Arborists and biologist consultant will oversee works where required to preserve and enhance existing tree buffers in the substantial parkland dedication areas, which comprise nearly 30% of the site.
  • Our commitment to environmental stewardship extends beyond the Peninsula Road setback.Throughout the 221 Minato Road development, we are prioritizing sustainable practices and habitat restoration. We are creating extensive green spaces, restoring riparian areas, and implementing measures to protect local wildlife. This plan will not only compensate for any trees lost during the setback reduction but will also enhance the overall biodiversity of the site.
  • We aim to create a community-friendly interface from this site and prioritize affordable housing so Ucluelet can continue to grow and thrive. After detailed review in the Environmental Assessment, Tree Survey and Archaeological Report we believe that the proposed building layout and proposed setback from Peninsula Road strikes the best balance to achieve our environmental restoration goals for the area while providing affordable housing in the time of great need.
  • Dedicated Parkland will ensure the highest protection of key tree areas near the shoreline and creek, enhanced by significant planting and regeneration works.
logo

Q5) Do Council members support extending the 50km/hr speed zone northwest by approximately 1000m and staff making a request to MoTI in advance of receiving a development application by ERIF.

A) District Of Ucluelet Mayor and Council

  • JH: “I am totally for this. That 50km should have been moved further outside of town ages ago. The parking that happens around Ancient Cedars zone has been really unsafe.”
  • SA: “ I echo that 100%. I like the idea of pushing out the town a little more. It would be another 20 seconds to reach town.”
  • MM: “Cart before the horse to approach MoTI ahead of the development application (if the two are linked).”
  • IK: “We were going to reduce speed limits across town. I wonder whether this is part of the same conversation. Generally 50km/hr, it could be slower, but I would support it.”
  • MMM: “I would support it. I agree, larger conversations are needed to look at all of town.”

A) ERIF

  • ERIF supports the Council’s views that reduction in the speed of PeninsulaRoad would benefit the Ucluelet community and both pedestrian and cyclist use of the area, particularly with Ancient Cedars access and the Health Clinic.
  • The MoTI has confirmed that if the Municipality wish to present this proposal they will work with you to undertake the necessary review by the MOTI Chief Engineer which can take sometime.
  • However, the Traffic Impact Assessment prepared by Watt Consulting, and the proposed traffic design for the development does not recommend nor require a reduction in speed on Peninsula Road. The report supports development of 221 Minato Road by upgrading Minato Road to be a municipal road and as the access road for the development.
  • This report has been filed with MOTI under file number 2024-04965. MOTI have given their initial written support for the proposal for residential access from Minato Road, noting this road is within the Municipal boundary and permitting falls under DOU.
  • They have expressed in-concept support for a gated emergency access to Peninsula Road, which will enable future-proofing for future OCP plans for Peninsula Road.
  • ERIF continues to work with MOTI to finalize the formal approvals of the Minato/Peninsula intersection.

Q6) Do Council members expect that if a zoning amendment and other approvals are granted, the affordable and/or attainable housing units would need to be ensured through housing agreements and covenants that are administered and monitored by the municipality or an experienced qualified third-party?

A) District Of Ucluelet Mayor and Councill

  • SA: “[ERIF] sat us down and showed us the numbers, it was astounding. This would work out to be incredibly affordable for people. I do think it needs to be run by a housing incorporation or an at arm’s length group.”
  • MMM: “I don’t believe it takes long to set up a housing authority.”
  • IK: “There is a critical first phase of this development that will warrant the formation of a housing authority, which will go on to have greater impact throughout the community for other small housing developments. This is the kickstarter for that.”
  • SA: “ERIF suggested approaching the community first. That was their suggestion first off. There will be a vetting process, but I thought having the community first was a great first step.”
  • JH: “We are at the point where a housing authority or third party would be very worthwhile. I don’t think the municipality should be doing it themselves.”
  • MM: “Short answer is yes. One unequivocal fact that the community needs affordable housing. It’s something unambiguous with no debate. We have an opportunity to partner with a developer that has that in mind. It’s not the municipality’s role, but whatever we can do to kickstart it we should. It would be a mistake not to explore that, encourage it and support it.”

A) ERIF

  • ERIF Housing Association, a not-for-profit organization, has been created to manage the attainable homeownership initiative.
  • ERIF has prepared a Draft Housing Agreement and Covenant Restrictions in our Development Permit application to confirm the commitment to affordable homes. We have established draft eligibility criteria for the attainable home ownership initiative and welcome your feedback.
  • The applications will be administered by The Gray Team and the not-for-profit with a selection panel formed to ensure a fair and transparent assessment of applications against these criteria.
  • This panel would ideally include representatives from the Municipality, the Chamber of Commerce, and a welfare organization. Similar developments have faced difficulties of much-needed dwellings remaining vacant due to overly restrictive requirements, and a transparent and responsive process will ensure financial sustainability for all parties involved.
  • ERIF Housing Association, in conjunction with a rental management company, will oversee the affordable rental processes, governed by the grant-funding restrictions.
  • Fair, transparent and accessible eligibility criteria is essential, whether administered by ERIF’s not-for-profit organization, or by partnering with a municipality-established housing cooperative.
  • By working together, we can ensure the development remains financially viable, while the housing cooperative serves the community's needs and future growth.

Q7) Do Council members have any initial concerns with the concept of extending a commercial designation to the area on the corner of Minato Road?

A) District Of Ucluelet Mayor and Council

  • JH: “I am not adverse to having a small commercial development. Where would the residents buy their milk? If this is going to be a neighbourhood with young kids maybe there is a daycare. There are options.”
  • MMM: “They want places to buy their products close by. I am in support of this.”
  • IK: “I do support the integration of commercial into residential neighbourhoods for this project.”
  • MM: “I wholeheartedly agree with the milk statement. Adding 250 doors, requires their needs to be serviced.”
  • SA: “I agree with all statements. This will add another pocket to town.”

A) ERIF

  • We value Councils comments and have allowed for adaptable spaces that can include retail store, other commercial and office space, giving priority to convenience of the local residents.

Q8) Do Council members have any initial concerns over a component of short-term vacation rentals in the current proposal at 221 Minato Road?

A) District Of Ucluelet Mayor and Council

  • IK: “The only concern I have is public perception. When ERIF showed us the numbers, the sliding scales showed how we could pay for affordable housing. The profit margins are very calculated, it needs to be just enough to balance the scales. There are other developments that have come to town who aren’t offering us anything. This sets a precedent, if you want limited STRs, you need to provide something to the community. I believe it supportable.”
  • MM: “This has been the opposite to usual STR conversations. I don’t support STR but I understand the math here. As reluctant as I am to support an STR, if that is the way forward than I would definitely consider that it’s the best out of a bad situation. As it’s been presented, I have difficulty criticizing it.”
  • SA: “The STRs are few compared to the whole project. Prop up wages deficit through providing affordable housing (for example: Vancouver nurse coming to do work locally).”
  • JH: “The only hesitation I have on this is that the 10 waterfront homes would be a part of the whole house short-term rentals.”
  • MMM: “I don’t believe they would be whole-house STRs. They would just have a unit that would be a short-term rental.”
  • JH: “It’s not apparent from the way it’s written, so I am unsure. Although I may not be an STR fan, it does allow this project to get off the ground.”

A) ERIF

  • The Development Permit seeks support for Lots 3 and 5 only to have a short-term rental component. These dwellings will support the financial feasibility of the affordable and attainable home development. To ensure a balanced mix of housing options, we could implement restrictions such as:
  1. At least one long-term rental (4+ months) or owner-occupied unit within each building: This would guarantee a certain level of permanent residency in all areas of the development. The remaining unit/s or suite/s would permit vacation rentals. This would allow for some flexibility while maintaining a predominantly long-term rental focus.
  2. Alternatively, within Lot 3 and Lot 5, a specific number of buildings could be designated for short-term rentals. This would limit the concentration of vacation rentals and help preserve the neighbourhood’s character.
  3. By incorporating these measures, we can create a development that provides both short-term rental opportunities and a stable residential community for financially viable attainable home ownership and affordable rentals in Ucluelet.

Q9) Subject to meeting environmental and servicing requirements, and subject to public comment, do Council members have any initial concerns with the concept of a temporary manufacturing facility on the eastern portion of the site?

A) District Of Ucluelet Mayor and Council

  • MMM: “I believe this is only 1 option they are looking at.”
  • SA: “I know people who are desperate for housing. There is light at the end of the tunnel. There is a price to pay for getting this done quickly, I don’t believe this is an expensive price.”
  • IK: “All developments will need to be built. A manufacturing facility is actually going to produce less noise and less waste compared to traditional construction.”
  • MM: “ERIF have a vertically integrated manufacturing capacity which makes this feasible. I agree this is a no-brainer that allows the developer to offer this product. Subject to environment reports.”
  • JH: “I concur with previous statements. I am not adverse.”
  • MM: “This will also make the process much quicker. That is something else to consider.”

A) ERIF

  • ERIF values the support expressed by the Council for a Temporary Access Permit to enable high-quality, all-seasons construction of the homes greener, smarter, and faster by establishing an on-site Construction Facility.
  • The Temporary Use Permit has been lodged with the Municipality on September 30.

Q1) In the Draft Housing By Law there is a termination date clause. What does this mean?

ERIF’s Answer:

  • All legal agreements have an end date, but the attainable and affordable rental condos proposed to be built on Lot 2 will belong to a not-for-profit housing provider, ERIF Housing Association, overseen by a housing committee made up of local community members. The intention is that these condos are an asset of attainably priced rental housing for the Ucluelet community in perpetuity.
  • 30% of the condos will be bound to being an ‘affordable’ rent rate as defined by the CMHC grant funding for a typical term of 20 years. The other 70% of the condos will be rented on the market at a rate not exceeding the definition of ‘attainable’ based on Ucluelet household incomes.
  • All legal agreements have an end clause, and the draft agreement has a nominated date of 2036. The reason for this is to ensure that the rental rate of ‘attainable’ and eligibility for the rentals can be carefully managed by the Not-for-Profit and in over ten-years’ time this may need some revision to respond to the economic conditions and needs of the community.
  • The Not-for-Profit Housing Society will remain bound by its purpose in the Constitution under the BC Register which is: “To provide quality, below-market housing which is crucial to the sustained prosperity and growth of a community by supplying, new home construction, home ownership and home rental programs.”
  • The Attainable Homeowner condos on Lot 1 will be sold at comparable below-market pricing when construction is completed. Additional clauses will be included in the sale contracts to ensure the owners are eligible, and if they sell the homes within early years of purchase (5 years), the condos remain at comparable below-market pricing.

Q2) What legal mechanisms are in place to ensure the housing commitments made are locked in for this development?

ERIF’s Answer:

  • There are several layers of legal assurance that Municipalities use to provide assurance that developers will meet the requirements of approval, and that attainable housing commitments are met. These draft documents are provided in the form of Housing By Laws, Housing Agreements, Covenant Restrictions on the land title and conditions of approval for Environmental, Development and Build Permits. These form binding legal agreements and while typical templates prepared by the DoU have been used, the details of the agreements are being reviewed by DoU solicitors. All documents have been provided in the Public Meeting Agenda for January 21, 2025.
  • Commitments to affordable and attainable homes are detailed in Housing Agreements signed by the applicant / landowner. The agreement includes a detailed definition of ‘Attainable’ pricing driven by the definition in the DoU’s Official Community Plan (OCP). These Agreements are then listed as a ‘Covenant Restriction’ on the titles for the land. Covenant Restrictions pass with the land and will bind any future owners, not just the applicant.
  • The ownership of the Lot 1 and Lot 2 land will be in a Not-for-Profit Housing Society, ERIF Housing Association. It is bound under BC legislation to serve its defined purpose under the BC Register of Companies which is: “To provide quality, below market housing which is crucial to the sustained prosperity and growth of a community by supplying, new home construction, home ownership and home rental programs”.
  • ERIF Housing Association is also bound under the grant conditions with CMHC that 30% of the rentals in Lot 2 will be at the ‘affordable’ fixed rates set by CMHC for the duration of the term of the grant which is typically 20 years.

Q3) Will there be a trail on the shoreline parkland and who will provide this?

ERIF’s Answer:

  • Over 35% of the land has been given back to the District, including a 30m setback from the shoreline. The District are now the legal owner of this Parkland and are best placed to weigh the pros and cons of a trail and its format, so the decision rests with them on whether and when to build a trail.
  • Council have heard arguments FOR a trail: Access to shore for tourism, guides walkers on where to step to protect the area. Community members also shared concerns AGAINST a trail: Safest to block access to mudflats, unsuitability of walking on mudflats, need for a wildlife corridor, risk to archaeological sites in the parkland. Similarly, some residents raised whether a kayak launch area should be built for community amenity at the end of Minato Rd and this is matter for Council as the owner of the shoreline Park.
  • Nonetheless, Council clarified at the Regular Meeting of September 24th, 2024, that they do not want much needed attainable homes being delayed based on the condition that a trail be installed before any homes can be occupied. Council also confirmed that if a trail was to be constructed Council can apply for grant funding for this trail construction under the Resort Municipality Initiative (RMI) grant scheme. This was considered a better funding source than through the developer which would add to the cost of the affordable and attainable homes.
  • ERIF’s Masterplan for the site provides for protection of the parkland areas by retaining walls that will prevent occupants directly accessing the mudflats. The Flood Hazard Assessment requires elevation of the homes above the flood level and this will be achieved by elevating the ground level and retaining walls. These retaining walls will provide a natural separation from the building lots to the shoreline – enjoying views of Olsen Bay’s beauty while providing a natural barrier from walking on the fragile Parkland area and the mudflat ecosystem within it. The walls and fences will be in place prior to occupation to protect the Park areas and shoreline.

Q4) What are the environmental features of the site and how will they be protected and preserved?

ERIF’s Answer:

  • More than 35% of the site has been preserved as a Parkland area and dedicated back to the District, so the legal title to these lands is with them for perpetuity, including 30m from the shoreline.
  • The site has had three separate Environmental Reports in the last 8 years, with Qualified Environmental Professional (QEP) site review walking the site in detail and documenting the ecological features to be protected and preserved. It is clear from BC Mapping and the District’s Official Community Plan that there are no wetlands identified on the land, and this has been confirmed in each of these site visits. There are two fish streams (17 and 17B) which are shown in the Official Community Plan and detailed recommendations have been provided for how to protect these, including the mainstream 17 being dedicated as Park land now owned by the District, setbacks and stormwater design giving consideration to natural benching of the creek.
  • The existing forest on the site was substantially cleared by a former owner nearly a decade ago and many of the remaining trees incurred damage that has been reviewed by a qualified Arborist noting that danger trees will need to be removed for community safety. While the 30m buffer of trees along Peninsula Road will be reduced to accommodate the attainable and affordable rental homes in Lot 2, this is not a clear cut. The tree buffer required is 10m from the lot boundary, which is approximately 20m from Peninsula Road. Additional information on this buffer can be found in the Q&As following Council’s Regular Meeting on September 24th, 2024, here: https://www.erif.ca/dou-council-qa.php
  • The site has been reviewed by a Qualified Environmental Professional (QEP) following extensive site investigation, walking the site in detail, review of provincial and local environmental mapping and regulations and prepared a 70+ page Environmental Report. This resulted in 40 recommendations to protect the existing fish streams and ecology and regenerate the forest where past damage has been done. Each of these 40 recommendations has been included in the draft Environmental Development Permit prepared by the DoU and attached to the Public Meeting Agenda.
  • The Environmental Development Permit provides conditions that need to be followed through the construction process including ongoing involvement and checks by the Qualified Environmental Professional.

Q5) How will traffic be managed around Minato Rd and Peninsula Rd?

ERIF’s Answer:

  • Detailed road and traffic assessment reports have been prepared and are published for the public to access which set out detailed modelling of projected residents, cars and trips. Based on these studies the report recommends carefully design best practice access roads to ensure traffic is safe and sustainable through each phase of the development. Access is designed from Minato Rd in accordance with the directions of the B.C. Ministry of Transport (MoT). This road will be upgraded to District standard design.
  • A secondary access to Peninsula Rd has been designed, but at this stage is only supported by the B.C. MoT Engineers for emergency use. It will be available for future use if and when the District applies to the MoT for a speed reduction on Peninsula Rd and a second access road is supported by the MoT.
  • The roads within the property are private roads, and their suitability for emergency access including flood evacuation have been reviewed in detail by the Fire Chief of Ucluelet to ensure complete compliance with the DoU’s published policy on emergency road design.
  • The design also works to link the homes with access to the excellent bike paths in place for green transport.

Q7) What flood measures will be taken to ensure risk is mitigated and managed?

ERIF’s Answer:

  • 221 Minato Rd applications have exceeded typical investigation and design for flood and tsunami. In addition to mapping by Ebbwater Engineering who prepared the District’s area flood maps, ERIF has had the highest qualified Coastal and Hydraulic Engineers in BC at Kerr Wood Liedel undertake detailed modelling of tsunami and projected sea rises for the next centuries to determine a safe level for construction, that the homes will be elevated above.
  • Detailed work has been done to ensure compliance with Provincial flood and tsunami regulations, with the firm preparing the report contributing to the development of these Provincial Guidelines. The flood engineering modelling and design is of such a high standard that the development has been issued a ‘Flood Assurance Statement’ which assures Council and homeowners that engineers certify the safety mitigation measures as a safe and appropriate development for the site.
  • The detailed reports have been included in the Public Meeting Agenda.
  • The Structural Mitigation measures have been developed based on international best practice for flood and tsunami management. Buildings on Lots 1, 2, 4 and 5 will be elevated above the flood level by retaining walls and building up the ground level above the flood levels.
  • The waterfront homes of Lot 3 incorporate world leading architectural design to keep habitable levels above the flood level. In addition to this, non-structural mitigation measures include evacuation routes within walking distance, early warning systems, on-site emergency wardens with additional training, community safety sessions and evacuation drills for residents. ERIF has worked closely with Ucluelet’s Fire Chief and emergency personnel to ensure road design is optimized for safe evacuation and there is capacity to assist residents in the event of emergency.

District of Ucluelet Council Meeting 21 January 2025 - Question & Answers

Q1) In the Draft Housing By Law there is a termination date clause. What does this mean?

ERIF’s Answer:

  • All legal agreements have an end date, but the attainable and affordable rental condos proposed to be built on Lot 2 will belong to a not-for-profit housing provider, ERIF Housing Association, overseen by a housing committee made up of local community members. The intention is that these condos are an asset of attainably priced rental housing for the Ucluelet community in perpetuity.
  • 30% of the condos will be bound to being an ‘affordable’ rent rate as defined by the CMHC grant funding for a typical term of 20 years. The other 70% of the condos will be rented on the market at a rate not exceeding the definition of ‘attainable’ based on Ucluelet household incomes.
  • All legal agreements have an end clause, and the draft agreement has a nominated date of 2036. The reason for this is to ensure that the rental rate of ‘attainable’ and eligibility for the rentals can be carefully managed by the Not-for-Profit and in over ten-years’ time this may need some revision to respond to the economic conditions and needs of the community.
  • The Not-for-Profit Housing Society will remain bound by its purpose in the Constitution under the BC Register which is: “To provide quality, below-market housing which is crucial to the sustained prosperity and growth of a community by supplying, new home construction, home ownership and home rental programs.”
  • The Attainable Homeowner condos on Lot 1 will be sold at comparable below-market pricing when construction is completed. Additional clauses will be included in the sale contracts to ensure the owners are eligible, and if they sell the homes within early years of purchase (5 years), the condos remain at comparable below-market pricing.

Q2) What legal mechanisms are in place to ensure the housing commitments made are locked in for this development?

ERIF’s Answer:

  • There are several layers of legal assurance that Municipalities use to provide assurance that developers will meet the requirements of approval, and that attainable housing commitments are met. These draft documents are provided in the form of Housing By Laws, Housing Agreements, Covenant Restrictions on the land title and conditions of approval for Environmental, Development and Build Permits. These form binding legal agreements and while typical templates prepared by the DoU have been used, the details of the agreements are being reviewed by DoU solicitors. All documents have been provided in the Public Meeting Agenda for January 21, 2025.
  • Commitments to affordable and attainable homes are detailed in Housing Agreements signed by the applicant / landowner. The agreement includes a detailed definition of ‘Attainable’ pricing driven by the definition in the DoU’s Official Community Plan (OCP). These Agreements are then listed as a ‘Covenant Restriction’ on the titles for the land. Covenant Restrictions pass with the land and will bind any future owners, not just the applicant.
  • The ownership of the Lot 1 and Lot 2 land will be in a Not-for-Profit Housing Society, ERIF Housing Association. It is bound under BC legislation to serve its defined purpose under the BC Register of Companies which is: “To provide quality, below market housing which is crucial to the sustained prosperity and growth of a community by supplying, new home construction, home ownership and home rental programs”.
  • ERIF Housing Association is also bound under the grant conditions with CMHC that 30% of the rentals in Lot 2 will be at the ‘affordable’ fixed rates set by CMHC for the duration of the term of the grant which is typically 20 years.

Q3) Will there be a trail on the shoreline parkland and who will provide this?

ERIF’s Answer:

  • Over 35% of the land has been given back to the District, including a 30m setback from the shoreline. The District are now the legal owner of this Parkland and are best placed to weigh the pros and cons of a trail and its format, so the decision rests with them on whether and when to build a trail.
  • Council have heard arguments FOR a trail: Access to shore for tourism, guides walkers on where to step to protect the area. Community members also shared concerns AGAINST a trail: Safest to block access to mudflats, unsuitability of walking on mudflats, need for a wildlife corridor, risk to archaeological sites in the parkland. Similarly, some residents raised whether a kayak launch area should be built for community amenity at the end of Minato Rd and this is matter for Council as the owner of the shoreline Park.
  • Nonetheless, Council clarified at the Regular Meeting of September 24th, 2024, that they do not want much needed attainable homes being delayed based on the condition that a trail be installed before any homes can be occupied. Council also confirmed that if a trail was to be constructed Council can apply for grant funding for this trail construction under the Resort Municipality Initiative (RMI) grant scheme. This was considered a better funding source than through the developer which would add to the cost of the affordable and attainable homes.
  • ERIF’s Masterplan for the site provides for protection of the parkland areas by retaining walls that will prevent occupants directly accessing the mudflats. The Flood Hazard Assessment requires elevation of the homes above the flood level and this will be achieved by elevating the ground level and retaining walls. These retaining walls will provide a natural separation from the building lots to the shoreline – enjoying views of Olsen Bay’s beauty while providing a natural barrier from walking on the fragile Parkland area and the mudflat ecosystem within it. The walls and fences will be in place prior to occupation to protect the Park areas and shoreline.

Q4) What are the environmental features of the site and how will they be protected and preserved?

ERIF’s Answer:

  • More than 35% of the site has been preserved as a Parkland area and dedicated back to the District, so the legal title to these lands is with them for perpetuity, including 30m from the shoreline.
  • The site has had three separate Environmental Reports in the last 8 years, with Qualified Environmental Professional (QEP) site review walking the site in detail and documenting the ecological features to be protected and preserved. It is clear from BC Mapping and the District’s Official Community Plan that there are no wetlands identified on the land, and this has been confirmed in each of these site visits. There are two fish streams (17 and 17B) which are shown in the Official Community Plan and detailed recommendations have been provided for how to protect these, including the mainstream 17 being dedicated as Park land now owned by the District, setbacks and stormwater design giving consideration to natural benching of the creek.
  • The existing forest on the site was substantially cleared by a former owner nearly a decade ago and many of the remaining trees incurred damage that has been reviewed by a qualified Arborist noting that danger trees will need to be removed for community safety. While the 30m buffer of trees along Peninsula Road will be reduced to accommodate the attainable and affordable rental homes in Lot 2, this is not a clear cut. The tree buffer required is 10m from the lot boundary, which is approximately 20m from Peninsula Road. Additional information on this buffer can be found in the Q&As following Council’s Regular Meeting on September 24th, 2024, here: https://www.erif.ca/dou-council-qa.php
  • The site has been reviewed by a Qualified Environmental Professional (QEP) following extensive site investigation, walking the site in detail, review of provincial and local environmental mapping and regulations and prepared a 70+ page Environmental Report. This resulted in 40 recommendations to protect the existing fish streams and ecology and regenerate the forest where past damage has been done. Each of these 40 recommendations has been included in the draft Environmental Development Permit prepared by the DoU and attached to the Public Meeting Agenda.
  • The Environmental Development Permit provides conditions that need to be followed through the construction process including ongoing involvement and checks by the Qualified Environmental Professional.

Q5) How will traffic be managed around Minato Rd and Peninsula Rd?

ERIF’s Answer:

  • Detailed road and traffic assessment reports have been prepared and are published for the public to access which set out detailed modelling of projected residents, cars and trips. Based on these studies the report recommends carefully design best practice access roads to ensure traffic is safe and sustainable through each phase of the development. Access is designed from Minato Rd in accordance with the directions of the B.C. Ministry of Transport (MoT). This road will be upgraded to District standard design.
  • A secondary access to Peninsula Rd has been designed, but at this stage is only supported by the B.C. MoT Engineers for emergency use. It will be available for future use if and when the District applies to the MoT for a speed reduction on Peninsula Rd and a second access road is supported by the MoT.
  • The roads within the property are private roads, and their suitability for emergency access including flood evacuation have been reviewed in detail by the Fire Chief of Ucluelet to ensure complete compliance with the DoU’s published policy on emergency road design.
  • The design also works to link the homes with access to the excellent bike paths in place for green transport.

Q7) What flood measures will be taken to ensure risk is mitigated and managed?

ERIF’s Answer:

  • 221 Minato Rd applications have exceeded typical investigation and design for flood and tsunami. In addition to mapping by Ebbwater Engineering who prepared the District’s area flood maps, ERIF has had the highest qualified Coastal and Hydraulic Engineers in BC at Kerr Wood Liedel undertake detailed modelling of tsunami and projected sea rises for the next centuries to determine a safe level for construction, that the homes will be elevated above.
  • Detailed work has been done to ensure compliance with Provincial flood and tsunami regulations, with the firm preparing the report contributing to the development of these Provincial Guidelines. The flood engineering modelling and design is of such a high standard that the development has been issued a ‘Flood Assurance Statement’ which assures Council and homeowners that engineers certify the safety mitigation measures as a safe and appropriate development for the site.
  • The detailed reports have been included in the Public Meeting Agenda.
  • The Structural Mitigation measures have been developed based on international best practice for flood and tsunami management. Buildings on Lots 1, 2, 4 and 5 will be elevated above the flood level by retaining walls and building up the ground level above the flood levels.
  • The waterfront homes of Lot 3 incorporate world leading architectural design to keep habitable levels above the flood level. In addition to this, non-structural mitigation measures include evacuation routes within walking distance, early warning systems, on-site emergency wardens with additional training, community safety sessions and evacuation drills for residents. ERIF has worked closely with Ucluelet’s Fire Chief and emergency personnel to ensure road design is optimized for safe evacuation and there is capacity to assist residents in the event of emergency.